REHABILITATION
Our Komatsu PC300-7 equipped with a jaws tilting digging bucket mobilizing to
Hamersley Iron Exploration’s rehabilitation programme. (Images to the right and
below)
|
 |
|
| |
|
|
Mobilizing to site. |
|
|
 |
|
| BJY
operators are trained and accustomed to working in the extreme and difficult remote
areas of Western Australia’s north-west. This consistently harsh area of WA contains
topographically difficult terrain in a number of places. BJY has earned a reputation
of respect within the industry for outstanding performance in these challenging
conditions. Its record in safety and operations speaks for itself. |
|
|
 |

Completion
of the program. This area has been rehabilitated to the satisfaction of the client
and the Department of Petroleum & Mineral Resources. It was completed on time
and the program complied with all safety and environmental aspects. BJY works
closely with its clients to ensure that their expectations are met or exceeded.
(Image
on the left) |
| |
|
|
 |
|
BHP Iron Ore 132kv Power Transmission Yandi to Newman rehabilitation. BJY was contracted by John Holland for BHPIO, to provide access to infrastructure and the 132kv Power Transmission Line, Yandi to Newman. After which BJY was again contracted to rehabilitate the pad surrounding areas and access tracks.
|
|
|
 |
|
MRWA Pilbara Division - rehabilitation of old borrow pit.
BJY successfully won the MRWA's tender to rehabilitate a 25 year old borrow pit located at Port Hedland. This lease is to be returned to Crown Land. As a training programme Pundulmurra College handled the re-seeding and revegetation.
|
|
|
 |
 |
 |
|
|