RAILROAD
CONSTRUCTION
BHP Billiton Iron Ore Yandi to Area ‘C’ (Mac) rail project.
Our PC300-7 complete with Gemco Sleeper Grab pulling a trackeng sleeper layer
on the BHP Billiton Iron Ore, Yandi to Area ‘C’ (Mac) rail project. (Image to
the right)
|
 |
|
| This
equipment is not commonly used within Australia and is only available for specific
new railroad construction. |
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
|
|
|
|
| |
|
|
For
the duration of the project our machines and operators were placed in situations
that tested their abilities to work in confined spaces and elevated areas.
Having been trained specifically for this project, our operators demonstrated
skills critical for the success of this construction program.
|
 |
|
|
Operators were required to ensure productivity schedules were met whilst ensuring
safety standards were adhered to. Our operators’ contribution to this project,
which was carried out in a difficult and remote environment, led to its overall
success. |
|
|
 |

The
completion of the project with Barclay Mowlem Construction Ltd pulling the rail
into place.
(Image to the left)
|
|
|
 |
 |
 |
|
|